ESA: ASSEMBLY/TEST OPERATION SHEET DEPT: AREA:
AFS/ASSY: 754343A DESC: Assembly of Torque links on Main Landing Gear CHG LVL: 1 BUILD:
  
GRAPHICS NAME:
TASK 1

Install the Upper torque link on the strut.

Install the Lower torque link on the axel.

Figure

TASK 2

Install the link pin and the spring pin on the Upper and Lower Torque Links.

Figure

TASK 3

Install the safety wireon each slotted spring pin.

Figure

TASK 4

Install the bolt on the torque links.

Install the washer.

Install the nut.

Install the cotter pin.

Figure

TASK 5

Install the switch terminal bracket on the Lower Torque Link.

Install the bolts.

Install the washers.

Install the nuts.

Figure

TASK 6

Install the switch bracket on the Upper torque Link.

Install the standoff bracket on the Upper torque Link.

Install the bolts.

Install the washers.

Install the nuts.

Install the cotter pins.

Figure

TASK 7

Install the clamp on the torque link standoff bracket.

Install the nut and screw.

Figure

TASK 8

Install the wheel assy.

     Speed: 
TYPE CODE S/M TOOL/PART NUMBER QTY NOMENCLATURE CSN/ETW FILE FIND
      BACN30ZR8KR  NUT     
      SB69HLJK190-03  STANDOFF BRACKET     
      BACN20ZR7DF  NUT     
      BSA-523657-3  BOLT     
      NAS2364F0846M  WASHER     
      SSA-520960-2  SCREW     
      BACN20ZR7DE  NUT     
      BSA-210940-1  BOLTS     
      BACP27FD05A67G  COTTER PIN     
      BACP27FD05A67G  COTTER PIN     
      BACP16BC02A10P  SPRING PIN     
      SB23FRGH760-01  SWITCH BRACKET     
      CP34FDST876-01  CLAMP     
      PF69HLJK190-05  SWITCH TERMINAL BRACKET     
      BACB40KL4C01  BOLT     
      BWT65T07321  WASHERS     
      BACN20XP7CD  NUT     
      BACP26BC42A10P  LINK PIN     
      300W028  SAFETY WIRE     
DOCUMENT PROPERTY RIGHTS NOTICE
THIS DOCUMENT IS THE...
SEQ:         ENGINE
 
PROD
0
PAGE
  of  
    INSP