TASK 00-00-00-000-000

Procedure


** ON A/C ALL
TASK 00-00-00-000-000 3D
1. Procedure
A. REGIONJETXAC1-CV1-CB2-10-02-0000-520A-D
SUBTASK 00-00-00-000-001 3D
(1)
NOTE
Procedures for the right and left components are the same. Only the procedures for the left are given.
SUBTASK 00-00-00-000-002 3D
(2) Remove the wheel assy.
SUBTASK 00-00-00-000-003 3D
(3) 1. Remove the screw (13), clamp (14) and nut (21) from the torque link standoff bracket (18).
(3) 2. Remove the cotter pins (16), nuts (15), washers (17), bolts (20), standoff bracket (18) and switch bracket (19) from the upper torque link (2).
(3) 3. Remove the nuts (12), washers (11), bolts (8) and the switch terminal bracket (9) from the lower torque link (7).[Figure]
(3) 4. Remove the cotter pin (5), nut (4), washer (6) and bolt (10) from the torque links (2 and 7).
(3) 5. Remove the safety wires from the upper and lower slotted spring pins (3). Remove the spring pins (3).[Figure]
(3) 6. Remove link pins (1) from the upper (2) and lower (7) torque links.
(3) 7. Remove the upper torque link (2) and lower torque link (7) from the strut and axle.
SUBTASK 00-00-00-000-004 3D
(4) Inspect the strut, pins and torque link bushings.[Figure]