Set-up T-3 and the Crane. Bring in the LPT Way.
Remove the AFT Frame by unscrewing the Turbine Way Bolts.
Push away the AFT Frame, using the Crane and the Chain T-3.
Move the LPT Way and detach the Low pressure turbine from the assembly.
Figure
Remove the LPT Upper Case. Set-up the Crane and T-4.
Remove the LPT Rotor from the LPT Lower Case with LPT Blades.
Push away the Low Pressure Turbine rotor using the Crane and T-4.
Push away the LPT Lower Case with LPT Blades using the LPT Way.
Remove the Turbine Way.